Wickham Road Highett

We’re removing all dangerous and congested level crossings on the Frankston Line by 2029. This means more benefits for local communities and a better transport network for all Victorians.

Future removals include:

As part of these level crossing removals, we’ll build new stations at Highett, Mordialloc, Aspendale and Seaford.

About 51,000 vehicles travel through these crossings each weekday, with boom gates down for up to 48 minutes of the morning peak.

More trains will be able to run on the Frankston Line when the Metro Tunnel opens in 2025, so removing these crossings now will prevent even more boom gate down time in the future.