The Toorak Road, Kooyong level crossing was removed in April 2020, with trains now travelling on the new rail bridge.
The level crossing was removed 6 months ahead of schedule, following major works starting in September 2019.
The removal of this major bottleneck reduced congestion and improved safety for those travelling through the area.
New and improved walking and cycling paths connecting to nearby parklands, as well as new open spaces, were created as part of the project.