We’ve upgraded Narre Warren North Road to improve safety and travel times for the more than 14,000 vehicles that use the road each day.
As part of the project, we’ve:
- added an extra lane in each direction between Fox and Belgrave-Hallam roads
- improved traffic flow through the Ernst Wanke Road intersection with an extra through-lane in each direction on Narre Warren North Road
- built a dedicated right turn lane from Heatherton Road to Belgrave-Hallam Road northbound to reduce congestion for vehicles travelling through to the Monash Freeway during peak periods
- installed traffic lights at Memorial Drive to improve safety and access for the CFA
- improved safety by removing right turns from Brundrett Road to Narre Warren North Road and making Crawley Road left-in and left-out only
- installed a signalised U-turn 20m south of the Memorial Drive intersection to provide safer access to Crawley Road
- upgraded the existing shared walking and cycling path on the western side of Narre Warren North Road and built a new footpath on the eastern side of the road
- installed high push buttons for equestrians at the upgraded Memorial Drive intersection.
Works started on the project in late 2021 and were completed in May 2023.
Visit the Narre Warren North Road Upgrade webpage for more information..