CityLink Tulla Widening – Stage 2
We upgraded an 8km section of the Tullamarine Freeway between Bulla Road and Melbourne Airport.
For Stage 2 of the upgrade, we:
- added an extra lane in each direction
- upgraded the Mickleham Road interchange
- built a new separated road and earlier exit to the M80 Ring Road
- rebuilt the English Street Bridge
- built a new separated road and earlier exit to English Street and Matthews Avenue
- installed new ramp signals to control the flow of traffic entering from the Calder Freeway
- built a bus bridge to give priority to buses exiting the airport and travelling towards the city
- installed new ramp signals to control the flow of traffic entering the Tulla Freeway.
Visit the CityLink Tulla Widening webpage for more information.