We've removed the level crossing at Calder Park Drive, Calder Park by building a road bridge over the rail line.
Removing this level crossing improves traffic flow in the area, allowing for the closure of the nearby level crossing at Holden Road.
More than 10,000 vehicles used these level crossings each day, facing delays of up to 26 minutes when 25 trains travelled through the crossings in the morning peak.