Stage 3 - New bridge over the Murray River

New bridge over the Murray River - Artist's impression subject to change.

Major works are now underway to build this new bridge over the Murray River.

The new Murray River crossing will be 622 metres long and sit 15 metres above the top of the riverbanks. The bridge will consist of 14 separate spans, from 34m long, up to 115m for the main span over the river.

Once opened in mid-2022, this new bridge will make it quicker and easier for you to travel between Echuca and Moama.