We’re lowering the freeway so the existing Cabena Street bridge can be kept. This will keep existing trees, reduce construction disruption and preserve this architecturally significant landmark. Improved entryways to the bridge will provide a better connection to Koonung Creek Trail for pedestrians and cyclists.